Noah Farrakhan, Xzavier Long lead Hampton past North Carolina A&T 74-73

GREENSBORO, N.C. (AP) — Noah Farrakhan scored 17 points and Xzavier Long made the first of two free throws with two seconds left to rally Hampton to a 74-73 victory over North Carolina A&T on Monday night.

Farrakhan added six assists and three steals for the Pirates (10-9, 3-4 Coastal Athletic Association). George Beale had 13 points and Long scored eight.

Landon Glasper had 21 points to lead the Aggies (4-16, 0-7), who have lost seven in a row. Ryan Forrest scored 20 and Jahnathan Lamothe finished with 13 points and 17 rebounds.

Farrakhan scored 11 points to guide Hampton to a 39-29 lead at halftime

___

The Associated Press created this story using technology provided by Data Skrive and data from Sportradar.

News from © The Associated Press, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

Join the Conversation!

Want to share your thoughts, add context, or connect with others in your community?

The Associated Press

The Associated Press is an independent global news organization dedicated to factual reporting. Founded in 1846, AP today remains the most trusted source of fast, accurate, unbiased news in all formats and the essential provider of the technology and services vital to the news business. More than half the world’s population sees AP journalism every day.