Regional district staff explain merits of composting facility choice to directors

PENTICTON – Regional District staff members have made their case for an organics composting facility in the Marron Valley, or alternatively, at the Summerland landfill.

They also explained why there was an urgency to move forward with the project at a recent Regional District Okanagan Similkameen board meeting.

Solid Waste coordinator Cameron Baughen said if the board does not make a site choice for its composting facility, the province may reject the Regional District’s proposal to use biocover, a cheaper but untested methodology in B.C., for natural gas capture at its Campbell Mountain Landfill.

Part of the District’s pitch to the province to use biocover hinges on halting the depositing of compost waste at the landfill, Baughen said, and if there isn't a clear choice of site, it may affect the province’s decision.

Baughen said the District had been actively looking for a composting site for several years, rejecting a composting facility at Campbell Mountain because of a lack of space. A proposed site on Spiller Road next to the landfill would be prohibitively expensive to develop for a composting site.

Regional District staff had pared down the site selection to two possibilities: the Summerland landfill and the Marron Valley site located on locatee land on the Penticton Indian Reserve.

Staff selected the Marron Valley site first overall, noting its positives in having the best access for sales of finished compost, and the cheapest in terms of transportation costs to the site.

The Summerland site would require higher travel distances, but did have some existing infrastructure in the form of a scale, Baughen noted.

A technical report on the Marron Valley’s odour models stated the odour drift would follow geography, not proximity to nearest residences, stating the report was available on line.

Baughen said the District was looking at best practises to build the site, including composting on non-permeable surfaces, in enclosed facilities where piping was located easily visible above ground to allow for daily inspections in order to prevent spills.

He said upgraded odour control would be needed for the Marron Valley site to deal with such issues as cold weather and temperature inversions.

Summerland director Peter Waterman expressed the need for clarity in the proposal calling it “critical.”

Baughen said next steps include a board decision in the next few months in order to give the province a six month window to respond.

A service area would need to be established, followed by a bylaw adoption and lease signing on the locatee land prior to a projected opening of the facility in 2020.


To contact a reporter for this story, email Steve Arstad or call 250-488-3065 or email the editor. You can also submit photos, videos or news tips to the newsroom and be entered to win a monthly prize draw.

We welcome your comments and opinions on our stories but play nice. We won't censor or delete comments unless they contain off-topic statements or links, unnecessary vulgarity, false facts, spam or obviously fake profiles. If you have any concerns about what you see in comments, email the editor in the link above. 

Join the Conversation!

Want to share your thoughts, add context, or connect with others in your community?

Steve Arstad

I have been looking for news in the South Okanagan - SImilkameen for 20 years, having turned a part time lifelong interest into a full time profession. After five years publishing a local newsletter, several years working as a correspondent / stringer for several local newspapers and seven years as editor of a Similkameen weekly newspaper, I joined iNFOnews.ca in 2014. My goal in the news industry has always been to deliver accurate and interesting articles about local people and places. My interest in the profession is life long - from my earliest memories of grade school, I have enjoyed writing.
As an airborne geophysical surveyor I travelled extensively around the globe, conducting helicopter borne mineral surveys.
I also spent several years at an Okanagan Falls based lumber mill, producing glued-wood laminated products.
As a member of the Kaleden community, I have been involved in the Kaleden Volunteer Fire Department for 22 years, and also serve as a trustee on the Kaleden Irrigation District board.
I am currently married to my wife Judy, of 26 years. We are empty-nesters who enjoy living in Kaleden with our Welsh Terrier, Angus, and cat, Tibbs.
Our two daughters, Meagan and Hayley, reside in Richmond and Victoria, respectively.

Steve Arstad's Stories