Elevate your local knowledge
Sign up for the iNFOnews newsletter today!
TRENTON, Mich. – Construction has been completed for a school ship dock and fishing pier at the gateway to the Detroit River International Wildlife Refuge.
Officials said in a release Monday the dock opens this spring. It extends 740 feet (225 metres) into the river and connects to a 200-foot (61-meter) fishing pier.
The new dock supports operations of Michigan Sea Grant’s Great Lakes school ship, which will use the river and refuge as a living laboratory for children.
Hundreds of donors contributed to the pier’s construction.
The Refuge Gateway, the site of a former automotive parts factory, was cleaned up and serves as an ecological buffer to the Humbug Marsh wetland. A visitor centre, canoe and kayak launch and other amenities also are expected to open this spring.
News from © iNFOnews.ca, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.